Circular waste water tub

With an area of 29,560 m2, the volumes realized for these works amount to 15,912 m2 of reinforcement, 8,406 m3 of concrete, 584 tons of iron and 68,080 m2 layers, which were realized in a period of 150 days..

View the project

Conical bathtub

About 1900 m2 of PERI RUNDFLEX system reinforcement, 1300 m3 of concrete with additive against aggressive agents, 113 tons of iron were used for their realization.

View the project

Pumping Station

During the 270-day period of the work, 7400 m2 of PERI DOMINO & TRIO rebar, 1505 m3 of concrete, 230 tons of iron and 1800 m2 of layers were realized.

View the project

American School, Lunder

An educational and recreational building with a floor area of 11748 m2, 1048 tons of iron and 15744 m3 in the area of Lundra, realized within a period of 1 year thanks to the work of the staff.

View the project

Shafts, scrapers

In order to meet the constructive and technical safety criteria, our company has introduced as a novelty the use of the retaining trusses of the well-known Italian company VEBRA s.r.l., as well as the PERI GRV system.

View the project

20-meter shaft, Tirana

The mechanization of the assisted process has led to the realization of 712 m3 of concrete, 370 m2 of reinforcement of the PERI GRV system, 60 tons of iron and 1600 m3 of excavated soil, all of this within a period of 45 days.

View the project

Sphinx, Durres

With a time limit of 3 months, our company has managed to realize one of the most difficult works realized due to the very fact of the presence of sea water.

View the project

Tamare-Vermosh road

The company has managed to build 6 km of retaining walls, 18 km of curbs and 6 km of capitals. The works were completed in a record time of 8 calendar months.

View the project

Submersible well 20m

Submersible well 20m

View the project

Road works

Skrapar, Albania

View the project

Vega Palace, Kamza overpass

With a floor area of 4750 m2, 300 tons of iron and 6250 m3 of armor, this object was completed within a period of 1 year.

View the project

Industrial Building, Marikaj

Industrial facility with a floor area of 3320 m2 realized within a period of 1 year thus carrying out 8728 m2 of armor as well as 294 tons of iron and overcoming the difficulties presented by the scaled construction.

View the project

Surrounding wall, Kashar

This facility is of special importance with an extension of 1053 ml as it performs not only the function of protecting the works from falling soil but also protecting the plant from unauthorized access.

View the project

The river of Tirana

A project with an initial extension of 7 km where along each one a very large number of hydraulic and constructive works have been conceived and built.

View the project

Two-story sewage building

Columns with a height of up to 10m, a light space of 10m as well as a soleta with an area of 1100m² have been the most difficult points of this object as these dimensions have a great demand for technical insurance as well as scaffolding.

View the project

Landfill of Tirana & Durres

The volumes in this construction site, in addition to the challenge of the difficult environment, have reached values such as 17,620 m2 of reinforcement, 320 m3 of concrete and 242 tons of iron.

View the project

Kapanon Industrial

Kapanon Industrial

View the project

Circumferential Canal

The realization of the wall in series was made possible thanks to the use of PERI DOMINO molds and in a period of 130 days it became possible to realize 13478 m2 of PERI DOMINO reinforcement, 4675 m3 of concrete as well as 300 tons of iron.

View the project

Water storage, Tirana

Another object of particular importance in the course of our company's work. For the water holding function itself, this work presents the challenges of carrying out a work where cracks and smaller ones are not allowed.

View the project

Water storage, Durrës

During the realization of this work, 3174 m2 of reinforcement, 220 tons of iron and 2420 m3 of concrete were carried out, these works were carried out within a period of 3 months.

View the project

Deigester

For the construction of this work, the innovation is the use of the PERI GRV system, which has made it possible to create the wall of the work without holes, which are necessary in other armor systems, based on the self-supporting ability of the system. armor.

View the project

Koplik prison in Shkoder

This object, which in terms of importance has been handled with great professionalism and in real time, where our company, within a period of 5 months, has completed the surrounding wall of 1.8 km and with a height of 6.7 m and a volume of 28750 m2 of armor, 362 tons of iron as and 8280 m3 of concrete.

View the project