Store:
Shehu Konstruksion
Feedback
0.00
(0 reviews)
Location:
Contact the seller

Construction

Vendor Categories Vendor Categories

Vendor Categories

Vendor filters Vendor filters

In stock
WM7946LI
Depo Water, Durrës Another object of particular importance in the course of our company's work. For the water holding function itself, this work presents the challenges of carrying out a work where cracks and smaller ones are not allowed. During the realization of this work, 3174 m2 of reinforcement, 220 tons of iron and 2420 m3 of concrete were carried out, these works were carried out within a period of 3 months.
In stock
WM8220QV
Industrial Object, Marikaj Industrial facility in plan with a surface of 3320 m2 realized within a period of 1 year, thus performing 8728 m2 of formworks and 294 tons of reinforcement and overcoming the difficulties that this facility had.
In stock
WM5954WP
Landfill of Tirana & Durrës These works, in terms of the work environment itself, present a very big challenge for the builder. Landifilli of Tirana presented a contract of 520,000.00 €, which was realized in a period of 2 months, thanks to the desire, dedication and the degree of mechanization. The volumes in this construction site, in addition to the challenge of the difficult environment, have reached values such as 17,620 m2 of reinforcement, 320 m3 of concrete and 242 tons of iron. In terms of the volume of works compared to the Tirana landfill, the Elbasan one is smaller and they reach the values of 2200 m2 of...
In stock
WM9035ON
Building, Kamza overpass A 9-storey residential building near Casa Italia, which in terms of geometric shapes and constructive details is a special object for our company. With a plan area of 4750 m2, 300 tons of reinforcement and 6250 m3 of formworks, this facility was achieved within a period of 1 year.
In stock
WM0920FG
Tirana River A project with an initial extension of 7 km where a large number of hydraulic and constructive works have been conceived and built along each. Recognizing the capacity of our company TREMA Engineering 2 JV STRABAG entrusted to our company some of the most difficult works such as: 1. Spillway in the river bed 2. Decanting tub 3. Retaining walls etc. where the volume of work performed have reached the figures of 2600 m2 of formworks, 11 tons of reinforcement and 250 m3 of concrete.
In stock
WM9656OJ
Fencing wall, Kashar This facility is of special importance with a range of 1053 ml as it performs not only the function of protection of works from landslides but also protection of the factory from unauthorized entrances. To guarantee good quality of works our firm has implemented PERI DOMINO & TRIO formworks. The need to be realized as soon as possible has pushed our firm to realize 10908 m2 of formworks , 5981 m3 of concrete, 446 tons of reinforcement and 7834 m2 of layers realized in a period of 120 days even though the conditions of sloping terrain and wall heights were not favorable. ...
In stock
WM8528GU
Koplik Prison, Shkodra This object, which in terms of importance has been handled with great professionalism and in real time, where our company, within a period of 5 months, has completed the surrounding wall of 1.8 km and with a height of 6.7 m and a volume of 28750 m2 of armor, 362 tons of iron as and 8280 m3 of concrete. The construction typology itself has imposed on our company the use of PERI DOMINO & TRIO bearing systems thus marking the further specialization of our company in these types of works.
In stock
WM2072LU
Crane Works As we have emphasized in all the works performed by our firm, the key point has been the mechanization of processes where the most important is that of lifting different objects and weights. Given the wide range of action of our company has been necessary the formation of a specialized group of operators and equipments of the latest technology. Our company currently has high tonnage cranes where mobile cranes are distinguished as: 1. LIEBHERR LTM 1040 2. KRUPP KMK 2025 3. ORMIG 623 cranes which reach lifting capacities up to 60 Ton. Having these capacities, our company performs works and for companies like...
In stock
WM2228MU
Deigester Special construction with 30m height and 23m diameter for wastewater treatment as well as key stages in the water treatment scheme, for the very process of gas formation from the decantation of organic waste. Being the first time that such a work is built in Albania, the care, dedication of the staff and the degree of mechanization have been maximum to ensure the realization of a work, which will be safe and durable in terms of constructive loads but also the action of corrosive agents. For the construction of this work, as a novelty is the use of the PERI GRV system, which has made possible the realization of...
In stock
WM1565ZB
Water tank, Tirana Another object of special importance in the ranks of our company. For the water-holding function itself, this work presents the challenges of carrying out a job where even the smallest cracks are not allowed.
In stock
WM8444ZW
American School, Lunder An educational and recreational building with a plan area of 11748 m2, 1048 tons of reinforcement and 15744 m3 of concrete in the Lundra area realized within a period of 1 year thanks to the work of the staff. Out-of-standard spaces, movie theaters and recreational facilities have been a challenge for the company staff. .
In stock
WM5709LF
Two-storey sewage building A rare object in our country in terms of function-size relationship. Columns with a height of up to 10 m, light space of 10 m and slats with an area of 1100 m ² have been the most difficult points of this building as these dimensions have a great demand for technical security and scaffolding.
In stock
WM4448RO
Industrual Companion
In stock
WM2947YZ
Sphinx, Durrës A recreational work built along the Adriatic to give another face to the city of Durrës as part of the urban renaissance. With a time frame of 3 months, our company has managed to realize one of the most difficult works realized due to the fact of the presence of sea waters. With a volume of 1920 m2 of formworks, 40 tons of reinforcement and 1400 m3 of concrete, this building merges with the panorama of the city. .
In stock
WM7111KH
20-meter Shaft, Tirana These geotechnical and constructive works have been and remain a special challenge for our firm for the changing conditions of soil geology and groundwater levels. In these constructions, in addition to the guarantee of works, safety at work is also important for us, where in the direction of this sector our company continues to invest with personal safety equipment (seat belts, hard hats, fixing hooks, fall prevention, self-retracting lifeline etc.) as well as equipment to guarantee secure shaft access (baskets). (kosha). . Based on the analogy of the hydraulic jacks of the car, our company with...
In stock
WM0030KV
Various works at very fast rates using machines of a very advanced technology
In stock
WM9033JB
Tamar-Vermosh Road A work which marks another qualitative step of our company towards the works such as retaining walls, etc., where in addition to the difficulties of the terrain and the lack of communication waves. The company has managed to realize 6 km of retaining walls, 18 km of curbs. The works were carried out in a record time of 8 calendar months.
In stock
WM1293WC
Reinforced concrete circular sewage tub A key stage as well as digester in the wastewater treatment scheme where the realization of constructive details is the most important point. In order to guarantee the speed and correctness in the realization of the work, prefabricated elements have been realized. . Apparently simple constructions with an area of 29560m2, the volumes realized for these works reach 15912 m2 of formworks, 8406 m3 of concrete, 584 tons of reinforcement and 68080 m2 of layers realized in a time period of 150 days. 
In stock
WM2856CD
With an experienced staff within the national district, we carry out various transports with our vehicles.
In stock
WM0620CG
In case of accidents, we offer our 24-hour service with cranes with high tonnage capacities. Assembly and Disassembly of tower cranes and many others.
In stock
WM9901YN
Plants, landfills, works of art, works at height, complex oval shapes, concreting with glaze quality and many others are some of the characteristics we offer
In stock
WM1115ZK
In all areas that our vehicles operate, we offer a rental service with our operators or drivers.
In stock
WM9070HK
Self-sinking Shafts, Skrapar One of the works for which our company is very proud of the quality of works, Safety measures and implementations also the cooperation with the well-known French company BeSSAC. Within a period of 3 months, thanks to the cooperation and mutual understanding were realized 2 shafts with these plane dimensions: 1. Internal diameter of 10.8 m and External diameter of 12.4 m 2. Shaft height of 11m. The greatest difficulty these works have encountered in the presence of groundwater as well as the variable geological formation for the very history of the formation of the geology of the city of...
In stock
WM5086GC
Pumping Station The outflow of treated water within the plant scheme from the constructive and functional point of view is the most important work, which must be treated with special care to guarantee the quality and speed of works. From its very function this object has many constructive details, which have been carefully treated to guarantee the quality of works. . In this building it was necessary to use PERI DOMINO & TRIO formworks, which due to their capacity have made it possible to concrete high and massive walls. During the 270-day period of the work, 7400 m2 of formworks for PERI DOMINO & TRIO, 1505 m3 of...
In stock
WM9643OI
Road Working Skrapar, Albania .
In stock
WM9555IG
Timber (Betoforma, Panels) of the highest quality from the most popular brands such as Peri, Doka, Ringer, etc., Bridge Scaffolding with very large bearing capacities, Metal Panels and various construction molds and many types of accessories can be found here. with very reasonable prices.
In stock
WM6167PH
Reinforced concrete Conical tub This concrete-reinforced construction is an interesting construction in terms of its function and construction methodology. These constructions after putting them to work they will be under the action of aggressive waters all the time and for this reason it has been necessary a correct realization of their constructive elements. . Based on this, our firm and its engineering staff have used the latest construction technology to realize them. For their realization are used about 1900 m2 of formwork of the PERI RUNDFLEX system, 1300 m3 of concrete with additive against aggressive agents, 113...
In stock
WM5619AY
Water Tank 20m
In stock
WM6395ED
Fencing channel This facility has a range of 1053 ml and aims to collect rainwater. The realization of the wall was made possible thanks to the use of PERI DOMINO formworks and in a period of 130 days it has become possible the realization of 13478 m2 of PERI DOMINO formworks, 4675 m3 of concrete and 300 tons of reinforcement.