Description
Tirana River
A project with an initial extension of 7 km where a large number of hydraulic and constructive works have been conceived and built along each. Recognizing the capacity of our company TREMA Engineering 2 JV STRABAG entrusted to our company some of the most difficult works such as: 1. Spillway in the river bed 2. Decanting tub 3. Retaining walls etc. where the volume of work performed have reached the figures of 2600 m2 of formworks, 11 tons of reinforcement and 250 m3 of concrete.
Similar Products
Reviews
No reviews found