Description
Pumping Station
The outflow of treated water within the plant scheme from the constructive and functional point of view is the most important work, which must be treated with special care to guarantee the quality and speed of works. From its very function this object has many constructive details, which have been carefully treated to guarantee the quality of works..
In this building it was necessary to use PERI DOMINO & TRIO formworks, which due to their capacity have made it possible to concrete high and massive walls. During the 270-day period of the work, 7400 m2 of formworks for PERI DOMINO & TRIO, 1505 m3 of concrete, 230 tons of reinfrocement and 1800 m2 of layers were realized.
Similar Products
Reviews
No reviews found