Description
Reinforced concrete Conical tub
This concrete-reinforced construction is an interesting construction in terms of its function and construction methodology. These constructions after putting them to work they will be under the action of aggressive waters all the time and for this reason it has been necessary a correct realization of their constructive elements..
Based on this, our firm and its engineering staff have used the latest construction technology to realize them. For their realization are used about 1900 m2 of formwork of the PERI RUNDFLEX system, 1300 m3 of concrete with additive against aggressive agents, 113 tons of reinforcement. Thanks to the high degree of mechanization of work processes, the period of realization of these constructions is reduced to 24 days.
Similar Products
Reviews
No reviews found