Description
Reinforced concrete circular sewage tub
A key stage as well as digester in the wastewater treatment scheme where the realization of constructive details is the most important point. In order to guarantee the speed and correctness in the realization of the work, prefabricated elements have been realized..
Apparently simple constructions with an area of 29560m2, the volumes realized for these works reach 15912 m2 of formworks, 8406 m3 of concrete, 584 tons of reinforcement and 68080 m2 of layers realized in a time period of 150 days.
Similar Products
Reviews
No reviews found